Louver Calibration
Runs the ModelS front louver calibration after actuator replacement. And returns the calibration status of all four louvers.
PROC_THC_X_LOUVER-CALIBRATION
ModelSX/tasks/PROC_THC_X_COOLANT-AIR-PURGE
Powers the accessory rail and runs HVAC pumps at maximum speed, changing the valve positions. Estimated time to complete is 20 minutes. To exit the routine early, run this routine again with STOP as the input.
Open a version to see its description, requirements, and input definitions. Hardware configuration and live vehicle checks also determine availability.
The Thermal Controller (THC) will continue to run coolant air purge until it completes or is requested to stop. Exiting this modal or cancelling the routine will not affect the THC's coolant air purge routine.
mode · String
START will start the routine and poll for results, STATUS returns the current active status, STOP will stop the routine if it is running.
Firmware default: START
Options: START, STATUS, STOP
poll · Bool
If selected, the routine will continue to poll the status of the coolant air purge routine on the THC and return success upon completion.
Firmware default: true
Runs the ModelS front louver calibration after actuator replacement. And returns the calibration status of all four louvers.
PROC_THC_X_LOUVER-CALIBRATION
Start thermal system test. It proceeds for 5 minutes.
PROC_THC_X_THERMAL-TEST-START
Start thermal system test with precondition. It preconditions if needed, and then proceeds for 5 minutes to run thermal system test.
PROC_THC_X_THERMAL-TEST-START-PRECONDITION
Tests communication with the Thermal Controller for Supercharger (THC) Electronic Control Unit (ECU). Communication is established via Unified Diagnostics Services (UDS) over the Controller Area Network (CAN).
PING-TP_THC