Coolant Air Purge
Powers the accessory rail and runs HVAC pumps at maximum speed, changing the valve positions. Estimated time to complete is 20 minutes. To exit the routine early, run this routine again with STOP as the input.
PROC_THC_X_COOLANT-AIR-PURGE